Our Service Coverage

VBT’s network services are available in Klang Valley throughout Prasarana’s Light Rapid Transit (LRT), Bus Rapid Transit (BRT), and Monorail (MRL) corridor from Gombak / Ampang to Puchong / Putra Heights. The map below provides detailed information of Interconnection Points, Data Centre Interconnection and Telco Exchanges.

  • Fiber laid across entire LRT, Monorail and BRT track spanning 105 KM and terminated at each total of 90 stations.
  • Further network expansion of an additional 38 KM (new LRT 3 Project) covering 25 stations (Bandar Utama-Klang Line) due by 2024/2025.
  • 288 Core(s) Protected Fiber Backbone infrastructure offers highly secure and redundant connectivity for large capacity and ultra-low latency requirements.
  • Interconnected with all major, local and international carriers.
  • Our network is located within the compounds of the Railway Protection Zone (RPZ) which are protected areas that restricted to the public, providing safety and security to the infrastructure.